发布时间:2025-09-18 21:39:08 分类:营销学堂
1.You need hire a professional manage team for the tomato paste producing , and the factory
director should have at least 3 years experience in tomato paste producing industry.
2.The factory building can be made of steel structure and the height of the factory building is
higher than 6m
3.Think about the harvest time of your local tomato, and usually it will need 6 months to make
this line works ( 3 month of manufacturing the line, 1 month of logistics time,
2 month of installation and commissioning)
4.For middle class line , it usually need 10-20 workers for the tomato paste line
5.You should have a good marketing team and selling channel for sell your paste
6.Maybe you can got the loan from your local bank base on this tomato paste production line.
7.You need a lab for this line , the lab include Titimeter, refractometer, incubator, microscope,
centrifuge, sugar meter, etc
8.You need have enough cash to buy the raw tomato for producing
9.If your local government has relevant support policies, you can seek financial support from your
local government base on your tomato paste line .
10.The price of 36/38 brix tomato paste in China is around 1500 usd ( at Year 2024)
11.8 ton of raw tomato can make 1 ton of 36/38 brix tomato paste
12.This production line requires a boiler, which is usually fueled by natural gas.So your place better
have the natural gas , if not , please let us know ,we will think the other type of boiler.
Welcome you to contact us
Name:Lucky Gee
Whatsapp: +8615195184730
Wechat: +8615195184730
Email: franklin1988999@gmail.com
Dongtai Championship Machinery Technology Co., Ltd.
Address:No.1 Gongye Avenue ,Liangduo Town, Dongtai City,
Jiangsu Province,China